A new environmentally friendly, green roof
University of Sussex – Promoting biodiversity with a new environmentally friendly, green roof on the Accelerator Building
Project Scope
Your content goes here. Edit or remove this text inline or in the module Content settings. You can also style every aspect of this content in the module Design settings and even apply custom CSS to this text in the module Advanced settings.
Solution Provided
Your content goes here. Edit or remove this text inline or in the module Content settings. You can also style every aspect of this content in the module Design settings and even apply custom CSS to this text in the module Advanced settings.
Challenges Faced
Your content goes here. Edit or remove this text inline or in the module Content settings. You can also style every aspect of this content in the module Design settings and even apply custom CSS to this text in the module Advanced settings.
Overview
Employer: Cantell School
Project Type: WC refurbishment to 3rd floor boys and girls wash rooms
Sector: Education
Procurement Route: Framework
Contract: JCT 2016 Design & Build
Value: £45,000
Duration on Site: 2 weeks
Location: Southampton, Hampshire
Completion: April 2021
Details of appointment:
- Project, Cost and Site Management (adopting Principal Contractor role) and all associated reporting.
- Architectural, mechanical and electrical design.
- General strip out of all existing fixtures, fittings, equipment and redundant washrooms.
- Installation of new LED lighting throughout.
- New suspended ceiling systems.
- Replacement vinyl floor finishes.
- Installation of replacement proprietary washroom cubicle systems.
- All new sanitaryware and associated plumbing alterations and installations.
- New fixtures and fittings including new hand driers and mirrors.
CLOSE TABS
This local Southampton school had a requirement to upgrade their boys and girls WC facilities on the 03rd floor of the main building, which had degraded and were showing considerable signs of heavy wear and tear and need for replacement and existing artificial light proved to be inadequate for the facility, owing to aging fluorescent lighting installations.
Under an existing Framework Contract with Mitie FM, i4 Projects were engaged to undertake a full strip out and refurbishment to both areas.
The completed refurbishment provided a clean, functional and much improved facility for the school and was completed on programme to coincide with school holiday closures.