NHS Tech Hub at St Mary's

Works undertaken at NHS Tech Hub at St Mary’s

Click Here for the full details
Project Scope

Your content goes here. Edit or remove this text inline or in the module Content settings. You can also style every aspect of this content in the module Design settings and even apply custom CSS to this text in the module Advanced settings.

Solution Provided

Your content goes here. Edit or remove this text inline or in the module Content settings. You can also style every aspect of this content in the module Design settings and even apply custom CSS to this text in the module Advanced settings.

Challenges Faced

Your content goes here. Edit or remove this text inline or in the module Content settings. You can also style every aspect of this content in the module Design settings and even apply custom CSS to this text in the module Advanced settings.

Overview

Employer: Cantell School
Project Type: WC refurbishment to 3rd floor boys and girls wash rooms
Sector: Education
Procurement Route: Framework
Contract: JCT 2016 Design & Build
Value: £45,000
Duration on Site: 2 weeks
Location: Southampton, Hampshire
Completion: April 2021

Details of appointment:
  • Project, Cost and Site Management (adopting Principal Contractor role) and all associated reporting.
  • Architectural, mechanical and electrical design.
  • General strip out of all existing fixtures, fittings, equipment and redundant washrooms.
  • Installation of new LED lighting throughout.
  • New suspended ceiling systems.
  • Replacement vinyl floor finishes.
  • Installation of replacement proprietary washroom cubicle systems.
  • All new sanitaryware and associated plumbing alterations and installations.
  • New fixtures and fittings including new hand driers and mirrors.
CLOSE TABS

Project Overview and Key Challenges:

Works comprised complete strip out of tired finishes and redundant services, installation of new suspended ceilings, new floor coverings, replacement led lighting, new desks together with associated hard-wired power and the removal of a redundant canteen and conversion to create a new glazed office.  